Automatic Transfer Switch (ATS)
- Rated current
- 32–600 A
- Poles
- 3, 4

Hospitals and clinics cannot wait for the grid to return. Mega Power supplies standby generator sets and automatic transfer switching, and tests and maintains them so they start when needed.
When the mains fails, critical loads must transfer to the generator automatically and quickly.
A standby set only helps if it starts: regular testing under load and maintenance records matter.
Generators near patients and staff call for attention to noise, exhaust and safe installation.

Equipment from the Mega Power catalog that matches these needs. Ratings and details are on each product page.




Tell us the load you need to power, the application and the operating environment, and we will recommend a suitable setup.