Site power and light from day one

Construction sites need power before the permanent supply exists, and light for work after dark. Mega Power rents and supplies generator sets, mobile lighting towers and fuel tanks for the site.

What the power system has to handle

  • No permanent supply

    Tools, cabins and equipment need power long before the building is connected to the grid.

  • Work after dark

    Night shifts and short winter days require mobile lighting that can be moved as the work progresses.

  • A changing site

    As the project moves, generators, fuel and distribution have to be relocated and resized.

Relevant equipment

Equipment from the Mega Power catalog that matches these needs. Ratings and details are on each product page.

View all products

Working with Mega Power

61
Generator models listed, from 4 engine brands
9
Services, from load study to emergency support
8
Low-voltage panel types, including transfer switches

Discuss your project

Tell us the load you need to power, the application and the operating environment, and we will recommend a suitable setup.

WhatsApp