
Synchronization panel
- Maximum rated current
- 6300 A
- Poles
- 3, 4

Data centers plan for power failure from the start. Mega Power supports that planning with load studies, generator sets, synchronization and transfer panels, testing and maintenance.
Critical loads are usually backed by more than one generator, which calls for synchronization and load sharing.
IT load grows over time, so the power system needs a load study and room to expand.
Backup systems are tested under load and maintained on a schedule to confirm they will carry the load.

Equipment from the Mega Power catalog that matches these needs. Ratings and details are on each product page.




Tell us the load you need to power, the application and the operating environment, and we will recommend a suitable setup.